Kietyönmäki Lithium Project

Lithium Projects

Kietyönmäki Lithium Project

Overview

Shallow spodumene lithium intercepts up to 25.95 m @ 1.52% Li₂O from 33.70 m depth down hole near the port of Pori, Finland

At a Glance

Location

Southern Finland (~100 km from the port of Pori)

Ownership

100%

Commodity

Lithium (spodumene)

Stage

Drill-defined; open along strike and at depth

Kietyönmäki — tenure and the spodumene Main Dyke (NordX; base data GTK).

Project Highlights

  • High-grade, shallow lithium — ~3,500 m of drilling across three campaigns (GTK, Sunstone, United Lithium/NordX Metals), with highlights of 25.95 m at 1.52% Li₂O from 33.7 m (hole ULDH-3) and 29.5 m at 1.45% Li₂O from 69.1 m (hole ULDH-4) — downhole widths, not true thicknesses.  
  • Open along strike and at depth — the main dyke extends over 200 m in strike and 160 m in depth, and thickens to the south-east. 
  • By-product credits — the spodumene- and petalite-bearing Main Dyke also carries tin and tantalum (ppm-level signals in samples, not ore-grade credits). 
  • Well positioned — accessible by major roads and ~100 km from the port of Pori.

Basis note: Drill highlights are individual intervals and do not constitute a mineral resource; no compliant (NI 43-101/JORC/PERC) resource has been declared. Figures are as disclosed by the Company and drawn from the June 2026 corporate presentation.