Kietyönmäki Lithium Project
Overview
Shallow spodumene lithium intercepts up to 25.95 m @ 1.52% Li₂O from 33.70 m depth down hole near the port of Pori, Finland
At a Glance
Location
Southern Finland (~100 km from the port of Pori)
Ownership
100%
Commodity
Lithium (spodumene)
Stage
Drill-defined; open along strike and at depth
Project Highlights
- High-grade, shallow lithium — ~3,500 m of drilling across three campaigns (GTK, Sunstone, United Lithium/NordX Metals), with highlights of 25.95 m at 1.52% Li₂O from 33.7 m (hole ULDH-3) and 29.5 m at 1.45% Li₂O from 69.1 m (hole ULDH-4) — downhole widths, not true thicknesses.
- Open along strike and at depth — the main dyke extends over 200 m in strike and 160 m in depth, and thickens to the south-east.
- By-product credits — the spodumene- and petalite-bearing Main Dyke also carries tin and tantalum (ppm-level signals in samples, not ore-grade credits).
- Well positioned — accessible by major roads and ~100 km from the port of Pori.
Basis note: Drill highlights are individual intervals and do not constitute a mineral resource; no compliant (NI 43-101/JORC/PERC) resource has been declared. Figures are as disclosed by the Company and drawn from the June 2026 corporate presentation.